13-B016 over THREE SAINTS MAIN CANAL
.44 M E NM-478 @ MP. 7.14 · County 013, New Mexico · Built 1972 · 2 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.097139, -106.646742
This bridge is in worse condition than 88.9% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
FR-1035 over UNNAMED WATERWAY
Built 1993
I-10 WB/EB over UNNAMED WATERWAY
Built 1955
FR-1035 over UNNAMED WATERWAY
Built 1993
NM-189 over RIO GRANDE
Built 1941
NM-227 over I-10 EB and WB
Built 1990
NM-226 over IRRIGATION CANAL
Built 1972
NM-226 over RIO GRANDE
Built 1941
I-10 WB/EB over UNNAMED WATERWAY
Built 1961
NM-28 over WESTSIDE CANAL
Built 1954
13-B008 over WEST SIDE CANAL
Built 1989
Bridge Details
- Structure #
- 000000000007700
- Year Built
- 1972
- Reconstructed
- 1994
- Length
- 8.9 m (29.2 ft)
- Max Span
- 8.1 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 337
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $27,000
- Total Project Cost
- $41,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.