NM-189 over RIO GRANDE
0.9 MI E OF JCT NM-28 · County 013, New Mexico · Built 1941 · 2 Lanes · 3,062 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.113653, -106.668539
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 85 years old.
Nearby Bridges
13-B016 over THREE SAINTS MAIN CANAL
Built 1972
NM-227 over I-10 EB and WB
Built 1990
I-10 WB/EB over UNNAMED WATERWAY
Built 1961
FR-1035 over UNNAMED WATERWAY
Built 1993
I-10 WB/EB over UNNAMED WATERWAY
Built 1955
CR B-31 over IRRIGATION CANAL
Built 1974
13-B008 over WEST SIDE CANAL
Built 1989
I-10 EBL over UNNAMED WATERWAY
Built 1955
NM-226 over IRRIGATION CANAL
Built 1972
NM-226 over RIO GRANDE
Built 1941
Bridge Details
- Structure #
- 000000000004551
- Year Built
- 1941
- Length
- 145.1 m (476 ft)
- Max Span
- 10 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 3,062
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $558,000
- Total Project Cost
- $837,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.