NM-313 over Las Huertas Creek
4.7 Mi N of Jct US-550 · County 043, New Mexico · Built 1975 · 2 Lanes · 7,686 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
35.371978, -106.495792
This bridge is in worse condition than 96.1% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 51 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1981
I-25 NBL/SBL over LAS HUERTAS CREEK
Built 1981
FR-2083 over UNNAMED WATERWAY
Built 1983
IA-2248 over UNNAMED WATERWAY
Built 1981
I-25 NBL/SBL/RAMP over UNNAMED WATERWAY
Built 1981
NM-315 over NBL/SBL I-25
Built 1983
NM-313 over Maria Chavez
Built 2011
I-25 NBL/SBL/FRTG over MARIA CHAVEZ ARROYO
Built 1955
I-25 NBL/SBL/FRTG over UNNAMED WATERWAY
Built 1957
FR-2083 over UNNAMED WATERWAY
Built 1981
Bridge Details
- Structure #
- 000000000007628
- Year Built
- 1975
- Length
- 28.7 m (94.2 ft)
- Max Span
- 9.1 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 7,686
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $310,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.