I-25 NBL/SBL/FRTG over MARIA CHAVEZ ARROYO
6.4 MI N Jct NM-44/I-25 · County 043, New Mexico · Built 1955 · 6 Lanes · 35,761 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.387967, -106.457392
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 71 years old.
Nearby Bridges
NM-313 over Maria Chavez
Built 2011
NM-315 over NBL/SBL I-25
Built 1983
I-25 NBL/SBL/RAMP over UNNAMED WATERWAY
Built 1981
IA-2248 over UNNAMED WATERWAY
Built 1981
I-25 NBL/SBL over N BRANCH MARIA CHAVEZ AR
Built 1955
FR-2084 over I-25 NBL and SBL
Built 1984
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1960
FR-2083 over UNNAMED WATERWAY
Built 1983
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1981
I-25 NBL/SBL over LAS HUERTAS CREEK
Built 1981
Bridge Details
- Structure #
- 000000000005761
- Year Built
- 1955
- Reconstructed
- 1983
- Length
- 10.7 m (35.1 ft)
- Max Span
- 2.4 m
- Lanes
- 6
- Daily Traffic
- 35,761
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $281,000
- Total Project Cost
- $422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.