US-60/285 WBL over Union Pacific Railroad
0.2 Mi W of US54/W Vaughn · County 019, New Mexico · Built 1979 · 2 Lanes · 3,129 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.588183, -105.254303
This bridge is in worse condition than 42.7% of bridges in County 019. The average bridge in New Mexico is 0 years old; this one is 47 years old.
Nearby Bridges
US-60/285 EBL over Union Pacific Railroad
Built 2002
US-54 over UNNAMED WATERWAY
Built 1938
US-54/60/285 over UNNAMED WATERWAY
Built 1979
US-60/285 over UNNAMED WATERWAY
Built 1979
US-54/60 EBL over BNSF Railroad
Built 1979
US-54 over UNNAMED WATERWAY
Built 1991
US-60 over UNNAMED WATERWAY
Built 1935
US-60 over UNNAMED WATERWAY
Built 1936
US-60/285 WBL over BNSF RAILROAD
Built 1985
US-60/285 EBL over BNSF Railroad
Built 1999
Bridge Details
- Structure #
- 000000000007624
- Year Built
- 1979
- Length
- 49.4 m (162.1 ft)
- Max Span
- 17.1 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,129
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $404,000
- Total Project Cost
- $607,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.