FR-2138 over I-25 NBLS/SBLS
1.7 M S OF S VEGAS INTRCH · County 047, New Mexico · Built 1973 · 2 Lanes · 332 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.545736, -105.227247
This bridge is in worse condition than 50.3% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
I-25 NBL over AGUA SARCA CREEK
Built 1973
FR-2116 over AGUA ZARCA
Built 1950
I-25 SBL over AGUA SARCA CREEK
Built 1973
47-Z024 over UNNAMED WATERWAY
Built 1983
NM-283 over AGUA ZARCA CREEK
Built 1979
I-25 NBL over LOOP-15/LAS VEGAS
Built 1973
NM-283 over I-25 NBL/SBL
Built 1973
I-25 SBL over LOOP-15/LAS VEGAS
Built 1973
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1973
I-25 NBL/SBL/FRNTG over UNNAMED WATERWAY
Built 1966
Bridge Details
- Structure #
- 000000000007328
- Year Built
- 1973
- Length
- 76.5 m (251 ft)
- Max Span
- 25.9 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 332
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.