I-40 EBL over AIRPORT ROAD @ MILAN

1.1 MI E OF EXIT-79 · County 006, New Mexico · Built 1971 · 2 Lanes · 25,103 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007317
Year Built
1971
Reconstructed
1999
Length
46 m (150.9 ft)
Max Span
21 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
25,103
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.