NM-122 over RIO SAN JOSE

E OF HORIZON AVE/MILAN W · County 006, New Mexico · Built 1952 · 6 Lanes · 6,839 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000005666
Year Built
1952
Reconstructed
1955
Length
26.8 m (87.9 ft)
Max Span
3 m
Width
34.5 m (113.2 ft)
Lanes
6
Daily Traffic
6,839
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.