IRR/NM-30 over GUACHUPANGE ARROYO
0.30 MI S OF JCT US-84 · County 039, New Mexico · Built 1969 · 4 Lanes · 7,677 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.986114, -106.080156
This bridge is in worse condition than 88.1% of bridges in County 039. The average bridge in New Mexico is 0 years old; this one is 57 years old.
Nearby Bridges
FL-5349 over RIO GRANDE
Built 1940
US-84/285 over RIO GRANDE
Built 1980
NM-68 SB over SANTA CRUZ RIVER
Built 1957
NM-68 NB over SANTA CRUZ RIVER
Built 1957
IRR/NM-30 over SANTA CLARA RIVER
Built 1968
IRR BIA RTE 600 over SANTA CLARA CREEK
Built 1980
US-84/285 over UNNAMED WATERWAY
Built 1963
NM-581 over ARROYO SECO
Built 1979
NM-584 over RIO GRANDE
Built 1977
IRR/NM-399 over ARROYO SECO
Built 1979
Bridge Details
- Structure #
- 000000000006990
- Year Built
- 1969
- Length
- 18.4 m (60.4 ft)
- Max Span
- 1.8 m
- Lanes
- 4
- Daily Traffic
- 7,677
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $262,000
- Total Project Cost
- $393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.