FL-5349 over RIO GRANDE
0.30 MI W OF NM 68 · County 039, New Mexico · Built 1940 · 2 Lanes · 9,647 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.990472, -106.073533
This bridge is in worse condition than 64.8% of bridges in County 039. The average bridge in New Mexico is 0 years old; this one is 86 years old.
Nearby Bridges
US-84/285 over RIO GRANDE
Built 1980
NM-68 SB over SANTA CRUZ RIVER
Built 1957
NM-68 NB over SANTA CRUZ RIVER
Built 1957
IRR/NM-30 over GUACHUPANGE ARROYO
Built 1969
US-84/285 over UNNAMED WATERWAY
Built 1963
NM-584 over RIO GRANDE
Built 1977
NM-581 over ARROYO SECO
Built 1979
IRR/NM-30 over SANTA CLARA RIVER
Built 1968
IRR BIA RTE 600 over SANTA CLARA CREEK
Built 1980
IRR/NM-399 over ARROYO SECO
Built 1979
Bridge Details
- Structure #
- 000000000001836
- Year Built
- 1940
- Reconstructed
- 2012
- Length
- 258.5 m (848.1 ft)
- Max Span
- 17.7 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 9,647
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,330,000
- Total Project Cost
- $5,910,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.