NM-1 over I-25 NBL and SBL
9.7 MI N OF SIERRA CL · County 053, New Mexico · Built 1968 · 2 Lanes · 27 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
33.606811, -107.152769
This bridge is in worse condition than 79.4% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 58 years old.
Nearby Bridges
I-25 SBL over SHEEP CREEK
Built 1968
I-25 NBL over SHEEP CREEK
Built 1968
FR-2032 over I-25 NBL and SBL
Built 1968
NM-1 over SHEEP CREEK
Built 1937
NM-1 over CRAWFORD HOLLOW
Built 1937
I-25 NB/SB over UNNAMED WATERWAY
Built 1937
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1937
I-25 NB over SIMON CANYON
Built 1937
NM-107 over I-25 NBL and SBL
Built 1968
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1968
Bridge Details
- Structure #
- 000000000006778
- Year Built
- 1968
- Length
- 125.9 m (413.1 ft)
- Max Span
- 30.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 27
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $631,000
- Total Project Cost
- $947,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.