NM-63 over PECOS RIVER
15.5 MI N OF JCT I-25 · County 047, New Mexico · Built 1967 · 2 Lanes · 595 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.696614, -105.689414
This bridge is in worse condition than 50.3% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 59 years old.
Nearby Bridges
NM-63 over PECOS RIVER
Built 1967
NM-63 over PECOS RIVER
Built 1963
NM-63 over PECOS RIVER
Built 1981
FDR 122 over HOLY GHOST CREEK
Built 1939
FDR 122 over HOLY GHOST CREEK
Built 1939
FDR 122 over HOLY GHOST CREEK
Built 1939
FDR 92 over COW CREEK
Built 1958
FDR 92 over COW CREEK
Built 1958
FDR 555 over COW CREEK
Built 1958
FS Road 122 over HOLY GHOST CREEK
Built 2015
Bridge Details
- Structure #
- 000000000006693
- Year Built
- 1967
- Reconstructed
- 1989
- Length
- 51.2 m (168 ft)
- Max Span
- 18.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 595
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $255,000
- Total Project Cost
- $382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.