FDR 122 over HOLY GHOST CREEK

0.291 NW/O 122/63 JCT · County 047, New Mexico · Built 1939 · 1 Lanes · 250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
031005000001508
Year Built
1939
Length
8 m (26.2 ft)
Max Span
7.4 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
250
Material
Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.