NM-500 over RIVERSIDE DRAIN/LEVEE RD
1.29 MW Jct NM-500/NM-47 · County 001, New Mexico · Built 1961 · 2 Lanes · 72,734 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.02725, -106.669233
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 65 years old.
Nearby Bridges
NM-500 WBL over RIVERSIDE DRAIN
Built 1985
NM-500 EBL over RIO GRANDE
Built 1961
NM-500 WBL over RIO GRANDE
Built 1985
NM-500 over South Diversion Channel
Built 2018
Prosperity Avenue over South Diversion Channel
Built 1968
NM-47 over South Diversion Channel
Built 1969
Murry Road over South Diversion Channel
Built 1968
NM-303 over SOUTH DIVERSION CHANNEL
Built 1969
I-25 South Bound over NM-500 / Rio Bravo
Built 2018
I-25 South Bound over North Bound off ramp
Built 2019
Bridge Details
- Structure #
- 000000000006225
- Year Built
- 1961
- Reconstructed
- 1985
- Length
- 29.9 m (98.1 ft)
- Max Span
- 11 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 72,734
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $207,000
- Total Project Cost
- $311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.