I-25 South Bound over NM-500 / Rio Bravo
JUNCTION I-25/NM-500 · County 001, New Mexico · Built 2018 · 3 Lanes · 85,959 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.023494, -106.638531
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 8 years old.
Nearby Bridges
I-25 NBL over NM-500 ( Rio Bravo Blvd)
Built 2018
I-25 South Bound over North Bound off ramp
Built 2019
I-25 North Bound over North Bound off Ramp
Built 2019
NM-500 over South Diversion Channel
Built 2018
FL-5000 over BNSF R/R Spur
Built 2008
FL-5000 over BNSF R/R
Built 2008
Prosperity Avenue over South Diversion Channel
Built 1968
I-25 SBL over Sandia Railroad Spur.
Built 2016
I-25 NBL over Sandia Railroad Spur
Built 2016
FL-5000 NBL over Tijeras Arroyo
Built 2007
Bridge Details
- Structure #
- 000000000009743
- Year Built
- 2018
- Length
- 68 m (223.1 ft)
- Max Span
- 38.1 m
- Width
- 19.2 m (63 ft)
- Lanes
- 3
- Daily Traffic
- 85,959
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.