US-550 SBL over HAMPTON ARROYO

0.70 MI N OF JCT NM 516 · County 045, New Mexico · Built 1961 · 2 Lanes · 15,330 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000006221
Year Built
1961
Length
36 m (118.1 ft)
Max Span
5.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
15,330
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000
Total Project Cost
$357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.