NM-516 EB over ANIMAS RIVER

0.1 MI W Jct US550/AZTEC · County 045, New Mexico · Built 1960 · 2 Lanes · 16,660 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006220
Year Built
1960
Length
119.5 m (392.1 ft)
Max Span
25.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
16,660
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$648,000
Total Project Cost
$972,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.