I-25 SBL over Central Avenue-FL4016
I-25 Over Central Avenue · County 001, New Mexico · Built 1961 · 4 Lanes · 187,263 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.082611, -106.636692
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 65 years old.
Nearby Bridges
I-25 NBL over Central Avenue-FL4016
Built 1961
I-25 SBL over Dr Martin L. King Ave.
Built 1961
I-25 NBL over Dr Martin L King Jr Dr
Built 1961
I-25 NBL over Lead Avenue
Built 1961
IN-2223 over I-25 OF RAMP TO LEAD
Built 1988
I-25 SBL over Lead Avenue
Built 1961
I-25 SBL over Coal Avenue
Built 1961
I-25 NBL over Coal Avenue
Built 1961
I-25 SBL over Lomas Boulevard
Built 2003
I-25 NBL over Lomas Boulevard
Built 2002
Bridge Details
- Structure #
- 000000000006150
- Year Built
- 1961
- Reconstructed
- 1988
- Length
- 61.6 m (202.1 ft)
- Max Span
- 31.4 m
- Width
- 26.2 m (86 ft)
- Lanes
- 4
- Daily Traffic
- 187,263
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.