I-25 SBL over Dr Martin L. King Ave.
Jct of I-25/I-40 · County 001, New Mexico · Built 1961 · 8 Lanes · 155,949 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.085267, -106.636181
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 65 years old.
Nearby Bridges
I-25 NBL over Dr Martin L King Jr Dr
Built 1961
I-25 SBL over Central Avenue-FL4016
Built 1961
I-25 NBL over Central Avenue-FL4016
Built 1961
I-25 NBL over Lead Avenue
Built 1961
IN-2223 over I-25 OF RAMP TO LEAD
Built 1988
I-25 SBL over Lead Avenue
Built 1961
I-25 SBL over Lomas Boulevard
Built 2003
I-25 NBL over Lomas Boulevard
Built 2002
I-25 SBL over Coal Avenue
Built 1961
I-25 NBL over Coal Avenue
Built 1961
Bridge Details
- Structure #
- 000000000006148
- Year Built
- 1961
- Reconstructed
- 2002
- Length
- 57 m (187 ft)
- Max Span
- 28.3 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 8
- Daily Traffic
- 155,949
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $529,000
- Total Project Cost
- $794,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.