US-70 EBL/WBL over I-25 NBL/SBL
Junction I-25/US-70 · County 013, New Mexico · Built 1960 · 3 Lanes · 21,621 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.348083, -106.769561
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 66 years old.
Nearby Bridges
US-70 WBL/EBL over I-25 SBL ON RAMP
Built 2002
IA-2006 over I-25 NBL and SBL
Built 2001
IA-2006 over US-70 WB FRONTAGE ROAD
Built 2002
IA-2006 over EB BATAAN MEMORIAL FR.
Built 2002
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1960
N. Triviz Drive over Alameda Arroyo
Built 2006
US-70 EBL/WBL over DEL REY BOULAVARD
Built 2002
Boxter Way over Alameda Arroyo
Built 2006
I-25 NBL/SBL over SANDHILL ARROYO
Built 1961
US-70 EBL over ALAMEDA ARROYO
Built 1957
Bridge Details
- Structure #
- 000000000006134
- Year Built
- 1960
- Reconstructed
- 2001
- Length
- 73.2 m (240.2 ft)
- Max Span
- 20.4 m
- Width
- 33.8 m (110.9 ft)
- Lanes
- 3
- Daily Traffic
- 21,621
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $515,000
- Total Project Cost
- $772,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.