US-70 EBL over ALAMEDA ARROYO
1.6 MI E OF NM-185/CRUCES · County 013, New Mexico · Built 1957 · 2 Lanes · 22,039 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.337581, -106.778006
This bridge is in worse condition than 88.9% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 69 years old.
Nearby Bridges
US-70 WBL over ALAMEDA ARROYO
Built 1957
Boxter Way over Alameda Arroyo
Built 2006
N. Triviz Drive over Alameda Arroyo
Built 2006
US-70 WBL/EBL over I-25 SBL ON RAMP
Built 2002
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1960
US-70 EBL/WBL over I-25 NBL/SBL
Built 1960
IA-2006 over I-25 NBL and SBL
Built 2001
IA-2006 over US-70 WB FRONTAGE ROAD
Built 2002
IA-2006 over EB BATAAN MEMORIAL FR.
Built 2002
US-70 EBL/WBL over DEL REY BOULAVARD
Built 2002
Bridge Details
- Structure #
- 000000000005723
- Year Built
- 1957
- Length
- 61.8 m (202.8 ft)
- Max Span
- 10.2 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 22,039
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $316,000
- Total Project Cost
- $474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.