US-64 WBL over I-25 NBL/SBL
Junction I-25/US-64/87 · County 007, New Mexico · Built 1959 · 2 Lanes · 5,574 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
36.885011, -104.430814
This bridge is in worse condition than 79.1% of bridges in County 007. The average bridge in New Mexico is 0 years old; this one is 67 years old.
Nearby Bridges
US-64 EBL over I-25 NBL/SBL
Built 1959
US-64 over Raton Creek
Built 2008
L-00017 over UNNAMED WATERWAY
Built 1950
07-Z000 over RATON CREEK
Built 1995
FL-5655 over RATON CREEK
Built 1993
NM-72 over I-25 NBL/SBL
Built 1960
FL-5652 over RATON CREEK
Built 1962
I-25 SBL over US 64/LOOP-17
Built 1959
I-25 NBL over US 64/LOOP-17
Built 1959
FL-5656 over NM-72
Built 1940
Bridge Details
- Structure #
- 000000000006108
- Year Built
- 1959
- Length
- 72.5 m (237.9 ft)
- Max Span
- 21.6 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 5,574
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $340,000
- Total Project Cost
- $570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.