NM-72 over I-25 NBL/SBL
1.0 MI N OF JCT US-64/87 · County 007, New Mexico · Built 1960 · 2 Lanes · 744 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.900372, -104.424853
This bridge is in worse condition than 79.1% of bridges in County 007. The average bridge in New Mexico is 0 years old; this one is 66 years old.
Nearby Bridges
FL-5652 over RATON CREEK
Built 1962
07-Z000 over RATON CREEK
Built 1995
FL-5655 over RATON CREEK
Built 1993
First Street over RATON CREEK
Built 1933
FL-5656 over NM-72
Built 1940
I-25 SBL over LINCOLN AVENUE
Built 1960
I-25 NBL over LINCOLN AVENUE (RATON)
Built 1960
FL-5650 over I-25 NBL/SBL
Built 1959
NM-72 over UNNAMED WATERWAY
Built 1995
FL-5656 over I-25 NBL/SBL
Built 1960
Bridge Details
- Structure #
- 000000000006209
- Year Built
- 1960
- Length
- 67.7 m (222.1 ft)
- Max Span
- 17.7 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 744
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $351,000
- Total Project Cost
- $527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.