I-25 SBL over Mountain Road
0.5 Mi S of Jct I-25/I-40 · County 001, New Mexico · Built 1959 · 6 Lanes · 155,949 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
35.093603, -106.633867
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 67 years old.
Nearby Bridges
I-25 NBL over Mountain Road
Built 1959
I-25 NBL over Lomas Boulevard
Built 2002
I-25 SBL over Lomas Boulevard
Built 2003
FL-5035 over I-25 NB/SB/SB Frntg Rd
Built 2002
I-25 NBL over Dr Martin L King Jr Dr
Built 1961
I-25 SBL over Dr Martin L. King Ave.
Built 1961
IN-2226 over I-25 SB Off Ramp
Built 2002
FL-5302 over North Diversion Channel
Built 1967
IU-2226 over EB & SB Frontage Roads
Built 2002
IN-2226 over I25 I40 Frntg Rd Rmps
Built 2002
Bridge Details
- Structure #
- 000000000005990
- Year Built
- 1959
- Reconstructed
- 2002
- Length
- 51.8 m (169.9 ft)
- Max Span
- 22.9 m
- Width
- 29 m (95.1 ft)
- Lanes
- 6
- Daily Traffic
- 155,949
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.