FR-2151 over UNNAMED WATERWAY
1.4 MI N OF JCT NM-120 · County 033, New Mexico · Built 1933 · 2 Lanes · 52 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.031233, -104.6947
This bridge is in worse condition than 70.9% of bridges in County 033. The average bridge in New Mexico is 0 years old; this one is 93 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1971
I-25 NBL/SBL over I-25 SERVICE ROAD
Built 1970
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1971
FR-2151 over UNNAMED WATERWAY
Built 1933
I-25 NBL over NM-120
Built 1971
I-25 SBL over NM-120
Built 1971
I-25 NBL/SBL over I-25 SERVICE ROAD
Built 1971
FR-2151 over VERMEJO DRAW
Built 1953
I-25 SBL over I-25 SERVICE ROAD
Built 1970
I-25 NBL over I-25 SERVICE ROAD
Built 1970
Bridge Details
- Structure #
- 000000000005458
- Year Built
- 1933
- Length
- 19.5 m (64 ft)
- Max Span
- 6.4 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 52
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $86,000
- Total Project Cost
- $130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.