FR-2151 over VERMEJO DRAW
2.5 MI S OF I-25/NM-120 · County 033, New Mexico · Built 1953 · 2 Lanes · 37 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.984975, -104.733111
This bridge is in worse condition than 70.9% of bridges in County 033. The average bridge in New Mexico is 0 years old; this one is 73 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1940
I-25 SBL over VERMEJO DRAW
Built 1971
I-25 NBL over VERMEJO DRAW
Built 1971
I-25 NBL over I-25 SERVICE ROAD
Built 1971
I-25 SBL over I-25 SERVICE ROAD
Built 1971
I-25 NBL/SBL over I-25 SERVICE ROAD
Built 1971
I-25 SBL over NM-120
Built 1971
I-25 NBL over NM-120
Built 1971
FR-2151 over UNNAMED WATERWAY
Built 1933
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1971
Bridge Details
- Structure #
- 000000000005274
- Year Built
- 1953
- Length
- 32.9 m (107.9 ft)
- Max Span
- 6.4 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 37
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $131,000
- Total Project Cost
- $197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.