NM-35 over WILLOW SPRING CANYON
5.1 MI N OF JCT NM-152 · County 017, New Mexico · Built 1941 · 2 Lanes · 1,168 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.85495, -107.979264
This bridge is in worse condition than 87.9% of bridges in County 017. The average bridge in New Mexico is 0 years old; this one is 85 years old.
Nearby Bridges
NM-152 over UNNAMED ARROYO
Built 1970
NM-35 over UNNAMED WATERWAY
Built 1970
NM-35 over UNNAMED WATERWAY
Built 1924
17-B019 over RIO MIMBRES
Built 1981
NM-152 over RIO MIMBRES
Built 1988
17-B009 over HANOVER CREEK
Built 1990
NM-152 over HANOVER CREEK
Built 1950
17-B007 over HANOVER CREEK
Built 1982
NM-61 over UNNAMED WATERWAY
Built 1948
NM-356 over UNNAMED WATERWAY
Built 1974
Bridge Details
- Structure #
- 000000000001873
- Year Built
- 1941
- Length
- 8.6 m (28.2 ft)
- Max Span
- 7.9 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,168
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,000
- Total Project Cost
- $53,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.