NM-35 over UNNAMED WATERWAY
.4 MI N OF JCT NM152/NM35 · County 017, New Mexico · Built 1924 · 2 Lanes · 1,168 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.815636, -107.934622
This bridge is in worse condition than 70.7% of bridges in County 017. The average bridge in New Mexico is 0 years old; this one is 102 years old.
Nearby Bridges
17-B019 over RIO MIMBRES
Built 1981
NM-152 over RIO MIMBRES
Built 1988
NM-152 over UNNAMED ARROYO
Built 1970
NM-35 over WILLOW SPRING CANYON
Built 1941
NM-61 over UNNAMED WATERWAY
Built 1948
17-B132 over Unnamed Waterway
Built 2011
NM-35 over UNNAMED WATERWAY
Built 1970
17-B013 over MIMBRES RIVER
Built 1974
17-17033 over COLD SPRING CANYON
Built 1908
17-B009 over HANOVER CREEK
Built 1990
Bridge Details
- Structure #
- 000000000001330
- Year Built
- 1924
- Length
- 19.5 m (64 ft)
- Max Span
- 9 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,168
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $71,000
- Total Project Cost
- $106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.