NO DATA ENTERED over EASTSIDE TRIB 3

NO DATA ENTERED · County 009, New Hampshire · Built 2015 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
092204000020795
Year Built
2015
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.