FLUME BUS ROUTE over PEMIGEWASSET RIVER

THE FLUME · County 009, New Hampshire · Built 1886 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
014801490011000
Year Built
1886
Length
15.8 m (51.8 ft)
Max Span
12.8 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.