I-93(RAMP 3N-F) over US 3

3.7 MI FROM WOODSTOCK TL · County 009, New Hampshire · Built 1986 · 1 Lanes · 402 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014801590010200
Year Built
1986
Length
45.4 m (149 ft)
Max Span
42.7 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
402
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.