LOON MOUNTAIN ROAD over E BR PEMIGEWASSET RIVER
315 FT FROM NH RTE 112 · County 009, New Hampshire · Built 2016 · 3 Lanes · 1,555 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.056758, -71.633328
This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 10 years old.
Nearby Bridges
NH112 KANCAMAGUS over E BR PEMIGEWASSET RIVER
Built 1938
NO DATA ENTERED over EASTSIDE TRIB 1
Built 2015
I-93 NB over CONNECTOR ROAD
Built 1973
I-93 SB over CONNECTOR ROAD
Built 1973
I-93 NB OFF RAMP over PEMIGEWASSET R CLARKS RR
Built 1973
I-93 NB over CLARKS RR PEMIGEWASSET R
Built 1981
I-93 SB over CLARKS RR PEMIGEWASSET R
Built 1973
CONNECTOR ROAD over PEMIGEWASSET RIVER
Built 1937
NO DATA ENTERED over EASTSIDE TRIB 3
Built 2015
I-93 NB over US 3
Built 1985
Bridge Details
- Structure #
- 014802120015100
- Year Built
- 2016
- Length
- 89.8 m (294.6 ft)
- Max Span
- 32.3 m
- Width
- 14.8 m (48.6 ft)
- Lanes
- 3
- Daily Traffic
- 1,555
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.