I-93 NB over TRIPOLI ROAD

3.46 MI LINCOLN TL · County 009, New Hampshire · Built 1972 · 2 Lanes · 7,017 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

43.989308, -71.672333

This bridge is in worse condition than 52.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
028402010010800
Year Built
1972
Reconstructed
1986
Length
45.1 m (148 ft)
Max Span
42.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,017
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.