NH175 over PEMIGEWASSET RIVER

0.6 MI EAST JCT US 3 · County 009, New Hampshire · Built 1976 · 2 Lanes · 682 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
028401950009300
Year Built
1976
Length
97.5 m (319.9 ft)
Max Span
36.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
682
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.