I-93 SB over NH175

2.57 MI THORNTON TL · County 009, New Hampshire · Built 1972 · 2 Lanes · 7,166 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
028402030008100
Year Built
1972
Reconstructed
2009
Length
25.9 m (85 ft)
Max Span
24.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,166
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.