PINE WOODS ROAD over MIREY BROOK

0.17 MI FR NH RTE119 · County 005, New Hampshire · Built 1920 · 2 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
027901400005600
Year Built
1920
Reconstructed
1998
Length
8.8 m (28.9 ft)
Max Span
8.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.