NH119 over ASHUELOT RIVER

.1 MI. FROM JCT. NH 10 · County 005, New Hampshire · Built 1962 · 2 Lanes · 3,648 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
027901130007700
Year Built
1962
Reconstructed
2011
Length
59.1 m (193.9 ft)
Max Span
22.9 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
3,648
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.