NH 10 over MIREY BROOK

0.2 MI FROM JCT RTE 78 · County 005, New Hampshire · Built 1940 · 2 Lanes · 8,914 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
027901200007700
Year Built
1940
Reconstructed
1987
Length
24.1 m (79.1 ft)
Max Span
9.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
8,914
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.