NH 25 NH118 over BAKER RIVER

3.6 MI FROM RUMNEY TL · County 009, New Hampshire · Built 1937 · 2 Lanes · 3,418 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
026901460012000
Year Built
1937
Reconstructed
1983
Length
30.5 m (100.1 ft)
Max Span
28.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,418
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.