NH 31 over ASHUELOT RIVER

1.85 MI. S. GOSHEN TL · County 019, New Hampshire · Built 1935 · 2 Lanes · 494 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
026500930015200
Year Built
1935
Reconstructed
1983
Length
10.1 m (33.1 ft)
Max Span
8.5 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
494
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.