AYERS POND ROAD over WOODWARD BROOK

0.7 MI FR EAST WASH. RD · County 019, New Hampshire · Built 2020 · 2 Lanes · 96 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
026501860012600
Year Built
2020
Length
11.1 m (36.4 ft)
Max Span
10.5 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
96
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.