NH 10 over S BRANCH SUGAR RIVER

0.6 MI FROM LEMPSTER TL · County 019, New Hampshire · Built 1928 · 2 Lanes · 1,915 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
009800830009600
Year Built
1928
Reconstructed
2004
Length
10.2 m (33.5 ft)
Max Span
9.6 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
1,915
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.