US 3 over BAGLEY BROOK

3.5 MI FROM CAMPTON TL · County 009, New Hampshire · Built 1933 · 2 Lanes · 1,291 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
025401880007000
Year Built
1933
Reconstructed
1985
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,291
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.