US 3 over HUBBARD BROOK

5.3 MI. FROM CAMPTON TL · County 009, New Hampshire · Built 1971 · 2 Lanes · 1,291 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
025401540007500
Year Built
1971
Length
15.5 m (50.9 ft)
Max Span
7.3 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
1,291
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.