I-93 NB over MERRILL ACCESS RD

3.8 MI CAMPTON TL · County 009, New Hampshire · Built 1969 · 2 Lanes · 7,102 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
025401730006600
Year Built
1969
Reconstructed
2001
Length
21.3 m (69.9 ft)
Max Span
20.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,102
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.