NH113 over CHOCORUA RIVER

5.1 MI NE JCT 25 & 113 · County 003, New Hampshire · Built 1925 · 2 Lanes · 2,159 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
025200950016200
Year Built
1925
Reconstructed
2018
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,159
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.