NH113 over FORREST BROOK
1.9 MI NE TAMWORTH TL · County 003, New Hampshire · Built 1955 · 2 Lanes · 2,779 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.892267, -71.159436
This bridge is in worse condition than 54.9% of bridges in County 003. The average bridge in New Hampshire is 0 years old; this one is 71 years old.
Nearby Bridges
EAST MADISON ROAD over FORREST BROOK
Built 1958
NH 16 over CHOCORUA RIVER
Built 1937
NH113 over CHOCORUA RIVER
Built 1925
NH 16 over CHOCORUA RIVER
Built 1939
DRAKE HILL ROAD over CHOCORUA RIVER
Built 1986
SCOTT ROAD over CHOCORUA RIVER
Built 2023
OSSIPEE LAKE ROAD over W BR SILVER RIVER
Built 1979
NH153 over STONY BROOK
Built 1929
DRAKE HILL ROAD over MEADOW BROOK
Built 1930
POTTER ROAD over SNOW BROOK
Built 2022
Bridge Details
- Structure #
- 016000810009000
- Year Built
- 1955
- Length
- 7.9 m (25.9 ft)
- Max Span
- 6.7 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,779
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.