NH113A over SWIFT RIVER

4.5 MI FROM SANDWICH TL · County 003, New Hampshire · Built 1956 · 2 Lanes · 356 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
025200610009100
Year Built
1956
Reconstructed
2023
Length
47.5 m (155.8 ft)
Max Span
17.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
356
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.