FOWLERS MILL ROAD over SWIFT RIVER

0.13 MI. RTE.113A · County 003, New Hampshire · Built 1920 · 1 Lanes · 96 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
025200580009300
Year Built
1920
Reconstructed
1991
Length
12.8 m (42 ft)
Max Span
9.4 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.