NH286 over BLACKWATER RIVER

.1 MI JCT RT 1-A · County 015, New Hampshire · Built 1991 · 2 Lanes · 13,696 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

42.871194, -70.824539

This bridge is in worse condition than 68% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
023402150005600
Year Built
1991
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
13,696
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.